Lee Seung-won: Latest Bridge Engineering Practice
Not only do students who first come in contact with bridge engineering, but they also want to learn basic knowledge about bridge engineering from the university and then help them to make as much of the latest curriculum as possible available for construction engineers who are on the ground. To do so, the latest and most recent methods of bridge have been developed and applied to help us write objectiveally about the construction of the construction and the main cross-sections, the time order, the main materials and the quality of the bridge. The latest method of this bridge deals with the latest high-inflict construction methods used on the site, as well as the highly frequent presium-Gerging, synthetic and synthetic lamen bridge, as much as concrete bridges, special bridges derived from the river, and the current high-frequency methods applied at the bridge site until the bridge reaches the hypothesis bridge. And the appendix also dealt with the often-obstructed bridge-to-site, post-tation system, new-tendance systems, left-hand equipment, bridge design, the type of floorboard, and the early Houssi bridge-based system of misdiagnosing.
Korean title: 최신 교량 공학 실무
Korean author: 이승원
Korean publisher: 구미서관
ISBN-13: 9791162572368












